Project Highlights

Personnel on Site: 18
Manhours: 5,000 +

Project Details

Centrals planned and executed the successful delivery of a new Heavy Mobile Equipment (HME) Workshop Facility for Crushing Services International, which included administration buildings, ablutions and a HME Wash Pad facility. The work included:

HME Workshop

Construction of a new HME workshop with dome shelter, electrical and hydraulic services for large dump trucks and other mining equipment, including a new concrete foundation (25 m long x 18 m wide) and eight (8) of 20 ft containers stacked two-high.

HME Workshop Relocation

Relocation of the high-top dome shelter and four (4) of 40 ft containers from Brockman 2 to Brockman 4. Including refurbishment and re-establishment of a new electrical and lighting package, suitable for the HME workshop environment. Construction of new concrete foundations, complete with cast in rails, to allow large mining and tracked equipment to be serviced.

HME Wash Pad Facility

Construction of a new wash facility for mining equipment. The main wash pad consisted of a 432 sqm concrete slab, graded at 300 mm fall to the drive in sump. The wash pad consisted of two (2) stair access towers with two (2) high-pressure cannons and four (4) cannons at ground level, all running from a variable speed multi-pump system. The wash bay has a oily water separator system, which treats water prior to discharge into the client’s water treatment plant.

HME Tyre Bay Changing Area

Construction of a reinforced concrete slab, suitable for single jacking points of 55,000 kg, designed to accommodate Komatsu 930E-4 Dump Trucks.

HME Warehouse/Store Facility

A 12 m wide by 12 m long, fit-for-purpose container/dome structure with one enclosed end for a warehouse. The design included a new lighting package and concrete floor with concrete apron, including footpaths. The scope included the relocation of five (5) 40 ft containers and fully enclosing the area with new 1.8 m high fencing and gates.

Administration and Ablution Buildings

A new 12 m x 12 m administration office and meeting room building, including the refurbishment of an existing ablution building. This comprised of civil, building, E&I and hydraulic services.

Brockman 4 Concrete Works & Dome Install

Project Details

Client: Crushing Services International

Location: Brockman 4, Pilbara, WA

Duration: 3 months

Completion: April 2022

Value: $4M